The refrigerator temporarily in the middle of the kitchen. This was expected to take 1 day to complete, but it took 3 days in reality. The door was installed in 1 day, but the plaster, sanding and details took longer. Luckily, this house has a loop layout. I can walk through the bedrooms to get to the kitchen from the living room while this door goes in. I feel like I’m camping, sort of.
The concrete pad expansion is done, tongue and groove panels are installed on the underside of the roof and the patio is now full size. I ‘m considering a fresh layer of concrete poured over the whole pad to cover any nicks or flaws in the concrete. But right now, I’m trying to finish the big stuff.
I expect the siding crew to be back next week to finish the siding around the new patio slider. I already have a painter lined up to paint the siding, and my gutter guy will be here to attach the gutters next. The last big thing is the metal roof on the back patio. Hopefully in 2 weeks this part of the project will be done.
Boy, the lights outside are cool. As is the new slider in your kitchen. It’s been a blast watching the remodel. Beautifully done so far.
LikeLiked by 1 person
What an awesome job you have done with this house. You are so talented.
LikeLiked by 1 person
Thanks for checking out my blog! It’s fun, and I’m super excited to finish the exterior so I can enjoy the yard this spring!